A variation approved before the crew leaves site

This contractor's subcontractor invoices took two to three weeks to check against the schedule, by which point the job had moved on. We built a field app that captures progress evidence on site, feeding an accounts agent that checks applications for payment against contract rates the same day.

Construction

0.0 daysfaster variation approval
Services
Mobile App Development, Accounts & Finance Agents
Duration
11 weeks
Year
2025

What was actually wrong.

Applications for payment were checked manually against the contract, retention terms and progress claims — a job for one overloaded quantity surveyor.

Site evidence for a variation arrived days after the work, usually as a phone photo with no context attached.

Overbilling was caught, when it was caught, after the payment had already gone out.

How we went at it.

01

Moved evidence capture onto the site itself

Photos, signatures and progress notes are captured on the field app at the point of work, offline where needed, timestamped and attached to the right line item.

02

Gave the accounts agent the contract, not just the invoice

Rates, retention and progress-claim terms are the agent's reference — every application is checked against what was actually agreed, not just what was billed.

03

Separated variations before they reached approval

Anything outside the base contract is flagged and evidenced on its own, so approval decisions are never made on a bundled, unclear total.

The build, in five panels.

Scroll the deck, or use the arrows. Everything here is also written out above and below.

Site photo
Signature
Field app
Line item
Accounts agent
01

Evidence captured on site

Photos and signatures attach to the right line item the moment the work happens, offline where needed.

Operator console
  • Application received
  • Matched to contract
  • Variation flagged
  • Approved
02

Checked against the actual contract

Rates, retention and progress terms are the agent's reference for every application, not the invoice alone.

3.5days faster
19%overbilling caught
0lost evidence
03

What moved

The first full quarter after rollout.

What moved, and over what period.

Reported against the metric agreed before the engagement started.

0.0 daysFaster variation approvalMedian, first full quarter
0%Overbilling caught pre-paymentVersus caught after, previously
0Site photos lost or unattributedSince the field app replaced phone cameras
We used to find the overbilling a month later, if we found it at all. Now it's caught before the payment run.

Built with

React NativeQuickBooksClaude

A control tower that finds the delay before the customer does

Next case study
Logistics & Supply Chain

Know what you need, or don't. We can help either way.

Already sure you want an agent, or a web, mobile or 3D product? We can scope it on the call. Still figuring it out? That's fine. AI is new, and we'll tell you honestly what's realistic. Chances are we've already worked with a company like yours, or a direct competitor, so we're not guessing.

Engagements start at $3,000. Typically live in under a month.